| ||||||||||||||||
|
Qualification of Patch Cords: At a Glance
Full Production Line Qualification of Patch Cords Certification Process
1) Send production samples Samples to be supplied: Production samples: 10 pcs of patch cords with min length and 10 pcs of patch cords with max length. Test programme
Electrical performance:
Testing conditions: The factory inspection:
The factory inspection will take place over one or two days, during which we evaluate the QA system: Usually there will be time left over during the inspection to have a discussion of general points, e.g. standardisation, market development, test methods, etc. Maintenance of Qualification Two (2) annual follow-up factory inspections will be required each year to maintain a full production line qualification. For each qualified type, ten (10) production samples of patch cords with minimum length and ten (10) with maximum length will be selected during the inspection for testing at 3P. Cost and Delivery Time Please contact 3P. |
||||||||||||||||
|
||||||||||||||||