1) Send production samples, 25% prepay Pre-testing is included in the 25% prepay. At any point, failing to meet the requirements will result in no extra costs, and new improved cable can be re-sent without additional costs. Qualification of Cables: At a Glance Full Production Line Qualification of Cables Certification Process
1) Send production samples, 25% prepay Pre-testing is included in the 25% prepay. At any point, failing to meet the requirements will result in no extra costs, and new improved cable can be re-sent without additional costs. Samples to be supplied: Production samples: 2x min 305m + extra if LSFROH fire retardancy testing is carried out. If Relex type of boxes, or equivalent, is supplied to the market then the test samples supplied to 3P must be box packed. Test programme
Electrical performance:
Material characteristics:
Safety testing: SIT simulated installation test The factory inspection:
The factory inspection will take place over one or two days, during which we evaluate the QA system: Usually there will be time left over during the inspection to have a discussion of general points, e.g. standardisation, market development, test methods, etc. Maintenance of Qualification Two (2) annual follow-up factory inspections will be required each year to maintain a full production line qualification. One (1) production sample of each qualified cable in regular production will be selected during the inspection for testing at 3P. If Relex type of boxes, or equivalent, is supplied to the market then the production samples must be box packed. Cost and Delivery Time Please contact 3P. |
||||||||||||||||
|
||||||||||||||||