Capability Approval of Links & Channels: At a Glance

Capability Approval of Links & Channels

Certification Process

1) Send production samples
2) Testing and evaluation
3) Documentation

Samples to be supplied:

Production samples:
One (1) link or channel with long length (typically 90m of horisontal between patch panel and wall outlet), and one (1) with short length (typically 30m of horisontal between patch panel and wall outlet).

Unless assembled by the client, assembly instructions must be provided.

Test programme

Electrical performance:
Return loss, attenuation, NEXT, FEXT, LCL, LCTL, DC resistance, current carrying capacity, transfer impedance, + optional EMC

Cost and Delivery Time

Please contact 3P.

Certification Process

1) Send production samples
2) Testing and evaluation
3) Documentation

Samples to be supplied:

Production samples:
One (1) link or channel with long length (typically 90m of horisontal between patch panel and wall outlet), and one (1) with short length (typically 30m of horisontal between patch panel and wall outlet).

Unless assembled by the client, assembly instructions must be provided.

Test programme

Electrical performance:
Return loss, attenuation, NEXT, FEXT, LCL, LCTL, DC resistance, current carrying capacity, transfer impedance, + optional EMC

Cost and Delivery Time

Please contact 3P.

Qualification of Links & Channels: At a Glance

Full Production Line Qualification of Links & Channels

Full production line qualification of a link or channel is only possible when all components are having a Full Production Line Qualification

Certification Process

1) All components must have a full production line qualification
2) Approval of the link & channel
3) Documentation

Cost and Delivery Time

Please contact 3P.